Tier-1 Master Closure Checklist
Parent: MASTER_OPERATING_PROMPT.md
Purpose: Definitive checklist — when ALL items pass, Dealix is Tier-1 complete.
Gate 1: Truth Lock
| # |
Item |
Required Evidence |
Status |
| 1.1 |
current-vs-target-register.md exists and is current |
File exists, audited |
Done |
| 1.2 |
No doc claims production for Watch/Target items |
Overclaim audit passes |
Done |
| 1.3 |
All Current vs Target tables are explicit |
Audit report |
Done |
Gate 2: Document Consistency
| # |
Item |
Required Evidence |
Status |
| 2.1 |
No dangling references across governance docs |
Audit report passes |
Done |
| 2.2 |
No overclaim in any document |
Audit report passes |
Done |
| 2.3 |
All paths root-safe |
architecture_brief.py passes |
Done |
| 2.4 |
Naming consistent (Operating Plane, Policy A/B/C) |
Audit report passes |
Done |
Gate 3: Decision Plane
| # |
Item |
Required Evidence |
Status |
| 3.1 |
17 structured output schemas defined |
schemas/structured_outputs.py |
Done |
| 3.2 |
Provenance on every output (trace_id, confidence, freshness) |
Provenance class |
Done |
| 3.3 |
No free-text in approval/commitment paths |
Schema enforcement |
Pending wiring |
| 3.4 |
Schema adherence measured for critical outputs |
Monitoring |
Target |
Gate 4: Execution Plane
| # |
Item |
Required Evidence |
Status |
| 4.1 |
Workflow inventory complete (short/medium/long) |
workflow-inventory.md |
Done |
| 4.2 |
3 Temporal candidates identified with specs |
Documented |
Done |
| 4.3 |
Idempotency requirements documented per workflow |
Documented |
Done |
| 4.4 |
Compensation logic template defined |
Documented |
Done |
| 4.5 |
At least 1 durable workflow live end-to-end |
Code + test |
Target |
Gate 5: Trust Fabric
| # |
Item |
Required Evidence |
Status |
| 5.1 |
Approval flow live for 1 path with SLA |
Working API + test |
Target |
| 5.2 |
Tool verification receipt for 1 tool call |
Receipt stored |
Target |
| 5.3 |
Contradiction detected in real scan |
Database record |
Target |
| 5.4 |
Evidence pack assembled from real data |
Pack with hash |
Target |
| 5.5 |
trace_id links decision → approval → execution → evidence |
Query proof |
Target |
| 5.6 |
OPA/OpenFGA/Vault/Keycloak adoption criteria documented |
trust-closure-plan.md |
Done |
Gate 6: Data & Connectors
| # |
Item |
Required Evidence |
Status |
| 6.1 |
Metric dictionary published |
connector-standard.md |
Done |
| 6.2 |
Connector facade standard documented |
connector-standard.md |
Done |
| 6.3 |
Health board shows real status for active connectors |
Live API |
Target |
| 6.4 |
No direct vendor bindings from agents |
Code review |
Partial |
| 6.5 |
At least 1 connector has full contract metadata |
Config |
Target |
Gate 7: Operating Plane
| # |
Item |
Required Evidence |
Status |
| 7.1 |
main branch protected with required checks |
GitHub settings |
Target |
| 7.2 |
CI runs architecture_brief.py |
Workflow step |
Target |
| 7.3 |
CODEOWNERS file exists |
File |
Target |
| 7.4 |
Secret scanning enabled |
GitHub settings |
Target |
| 7.5 |
1 release gate production-grade |
Working gate |
Target |
| 7.6 |
Every deployment links to commit SHA |
Provenance |
Target |
Gate 8: Saudi/GCC Readiness
| # |
Item |
Required Evidence |
Status |
| 8.1 |
Arabic-first path end-to-end for 1 flow |
Working demo |
Target |
| 8.2 |
PDPL processing register documented |
saudi-enterprise-readiness.md |
Done |
| 8.3 |
Data classification scheme applied |
At least 1 flow |
Target |
| 8.4 |
NCA ECC gap analysis completed |
Documented |
Done |
| 8.5 |
OWASP LLM Top 10 controls verified |
Checklist |
Done |
| 8.6 |
AI governance checklist in release review |
Process |
Target |
Gate 9: Executive Surfaces
| # |
Item |
Required Evidence |
Status |
| 9.1 |
Executive Room shows real data |
Live API |
Target |
| 9.2 |
Approval Center queries real records |
Live API |
Target |
| 9.3 |
Saudi Compliance runs real checks |
Live checks |
Target |
| 9.4 |
1 surface used in real weekly review |
Stakeholder confirmation |
Target |
| 9.5 |
Board-ready export path works |
PDF/JSON export |
Target |
Gate 10: Market Dominance
| # |
Item |
Required Evidence |
Status |
| 10.1 |
Product packaging defined (3 tiers) |
market-dominance-plan.md |
Done |
| 10.2 |
ROI narrative with quantified metrics |
Documented |
Done |
| 10.3 |
Competitive wedge documented |
Documented |
Done |
| 10.4 |
Capability moat map documented |
Documented |
Done |
| 10.5 |
Executive sales story (4 personas) |
Documented |
Done |
| 10.6 |
Reference architecture diagram |
Documented |
Done |
Summary
| Gate |
Done |
Target |
Total |
| G1: Truth Lock |
3 |
0 |
3 |
| G2: Document Consistency |
4 |
0 |
4 |
| G3: Decision Plane |
2 |
2 |
4 |
| G4: Execution Plane |
4 |
1 |
5 |
| G5: Trust Fabric |
1 |
5 |
6 |
| G6: Data & Connectors |
2 |
3 |
5 |
| G7: Operating Plane |
0 |
6 |
6 |
| G8: Saudi/GCC |
3 |
3 |
6 |
| G9: Executive Surfaces |
0 |
5 |
5 |
| G10: Market Dominance |
6 |
0 |
6 |
| TOTAL |
25 |
25 |
50 |
Completion: 50% — All documentation gates done. Runtime/integration gates remain.