system-prompts-and-models-o.../docs/execution-matrix-90d-tier1.md

4.6 KiB
Raw Blame History

90-day Tier-1 execution matrix (Phase 01)

Purpose: Translate Phase 0 (030d) and Phase 1 (3090d) outcomes from the Tier-1 roadmap into measurable deliverables tied to existing repo artifacts.
Agent truth source: Execution_Matrix.md — this file does not duplicate all agent rows; it maps milestones to evidence and matrix coverage.

Blueprint index: blueprint-master-architecture.md.


Phase 0 (days 030): control + operating baseline

Goal: Stabilize control plane and operating plane so later agent and workflow expansion is auditable.

# Outcome Evidence / artifact Execution_Matrix touchpoints (examples)
P0.1 A / R / S on governed events and APIs documented and used in reviews governance/approval-policy.md; PR checklist Policy & Compliance agent (row 15); any row with HITL
P0.2 Event envelope + schema discipline agreed and referenced in new events governance/events-and-schema.md; schema folder or ADR All rows with Events In/Out
P0.3 Trace/correlation standard across API + workers + agent runs OTel or structured logging ADR; sample trace Executive Intelligence, Strategic PMO
P0.4 GitHub governance (rulesets, required checks, no direct push to main) documented for org governance/github-and-release.md Operating plane
P0.5 Executive room skeleton — doc + minimal UI/API stub behind flag salesflow-saas/docs/ + backend route spec Executive Intelligence (row 16)
P0.6 AI governance baseline (NIST AI RMF / OWASP LLM alignment register) governance/saudi-compliance-and-ai-governance.md Trust fabric
P0.7 PDPL / NCA readiness register (non-legal checklist) Same + salesflow-saas/docs/legal/ Policy & Compliance; DD Analyst

Exit criteria for Phase 0: checklist items P0.1P0.4 done in repo/docs; P0.5P0.7 at least drafted with owner and review date.


Phase 1 (days 3090): Revenue + Partner OS MVP

Goal: First partner + revenue loop with evidence pack v1 and tool verification v1 on critical paths.

# Outcome Evidence / artifact Execution_Matrix touchpoints (examples)
P1.1 Partnership Scout path: scouted → scored with audit fields Tests + API or worker logs Partnership Scout (row 2)
P1.2 Qualification / triage for leads with structured memo output JSON memo contract + tests Lead Intelligence (row 10)
P1.3 Strategic PMO milestone tracking integrated with real task source Integration note + API Strategic PMO (row 14)
P1.4 Connector / action facades for first external channel (e.g. messaging) with retries + idempotency Facade module + contract tests Executive Outreach (row 11); Policy gates
P1.5 Partner scorecards reproducible from data (not ad-hoc LLM text) Query or report + snapshot tests Partnership Scout; Alliance Structuring (row 3)
P1.6 Forecast vs actual slice for one KPI (pipeline or revenue) Semantic metric definition in one place Customer Expansion (row 13); analytics docs
P1.7 Evidence pack v1 template used on Class B decisions Template in docs + one exemplar PR Alliance Structuring (term sheet HITL); Proposal (row 12)
P1.8 Tool verification v1 on at least one tool surface (intended vs actual logged) Log schema or table + test Trust fabric; any tool-using agent

Exit criteria for Phase 1: P1.1P1.4 shipped behind flags or staging with tests; P1.5P1.8 documented + one end-to-end demo with evidence references (no production claims without verify-launch / pytest where applicable).


Dependency order

  1. Phase 0 operating + policy + events before widening external connectors.
  2. Evidence pack + tool verification in parallel with first Partner/Revenue MVP features.
  3. Temporal / OPA / OpenFGA only after adr/0001-tier1-execution-policy-spikes.md approval and spike evidence — see execution fabric doc.

See also: dealix-six-tracks.md, governance/discovery-and-output-checklist.md.