# Tier-1 Master Closure Checklist > **Parent**: [`MASTER_OPERATING_PROMPT.md`](../MASTER_OPERATING_PROMPT.md) > **Purpose**: Definitive checklist — when ALL items pass, Dealix is Tier-1 complete. --- ## Gate 1: Truth Lock | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 1.1 | `current-vs-target-register.md` exists and is current | File exists, audited | Done | | 1.2 | No doc claims production for Watch/Target items | Overclaim audit passes | Done | | 1.3 | All Current vs Target tables are explicit | Audit report | Done | ## Gate 2: Document Consistency | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 2.1 | No dangling references across governance docs | Audit report passes | Done | | 2.2 | No overclaim in any document | Audit report passes | Done | | 2.3 | All paths root-safe | `architecture_brief.py` passes | Done | | 2.4 | Naming consistent (Operating Plane, Policy A/B/C) | Audit report passes | Done | ## Gate 3: Decision Plane | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 3.1 | 17 structured output schemas defined | `schemas/structured_outputs.py` | Done | | 3.2 | Provenance on every output (trace_id, confidence, freshness) | `Provenance` class | Done | | 3.3 | No free-text in approval/commitment paths | Schema enforcement | Pending wiring | | 3.4 | Schema adherence measured for critical outputs | Monitoring | Target | ## Gate 4: Execution Plane | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 4.1 | Workflow inventory complete (short/medium/long) | `workflow-inventory.md` | Done | | 4.2 | 3 Temporal candidates identified with specs | Documented | Done | | 4.3 | Idempotency requirements documented per workflow | Documented | Done | | 4.4 | Compensation logic template defined | Documented | Done | | 4.5 | At least 1 durable workflow live end-to-end | Code + test | Target | ## Gate 5: Trust Fabric | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 5.1 | Approval flow live for 1 path with SLA | Working API + test | Target | | 5.2 | Tool verification receipt for 1 tool call | Receipt stored | Target | | 5.3 | Contradiction detected in real scan | Database record | Target | | 5.4 | Evidence pack assembled from real data | Pack with hash | Target | | 5.5 | trace_id links decision → approval → execution → evidence | Query proof | Target | | 5.6 | OPA/OpenFGA/Vault/Keycloak adoption criteria documented | `trust-closure-plan.md` | Done | ## Gate 6: Data & Connectors | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 6.1 | Metric dictionary published | `connector-standard.md` | Done | | 6.2 | Connector facade standard documented | `connector-standard.md` | Done | | 6.3 | Health board shows real status for active connectors | Live API | Target | | 6.4 | No direct vendor bindings from agents | Code review | Partial | | 6.5 | At least 1 connector has full contract metadata | Config | Target | ## Gate 7: Operating Plane | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 7.1 | `main` branch protected with required checks | GitHub settings | Target | | 7.2 | CI runs `architecture_brief.py` | Workflow step | Target | | 7.3 | CODEOWNERS file exists | File | Target | | 7.4 | Secret scanning enabled | GitHub settings | Target | | 7.5 | 1 release gate production-grade | Working gate | Target | | 7.6 | Every deployment links to commit SHA | Provenance | Target | ## Gate 8: Saudi/GCC Readiness | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 8.1 | Arabic-first path end-to-end for 1 flow | Working demo | Target | | 8.2 | PDPL processing register documented | `saudi-enterprise-readiness.md` | Done | | 8.3 | Data classification scheme applied | At least 1 flow | Target | | 8.4 | NCA ECC gap analysis completed | Documented | Done | | 8.5 | OWASP LLM Top 10 controls verified | Checklist | Done | | 8.6 | AI governance checklist in release review | Process | Target | ## Gate 9: Executive Surfaces | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 9.1 | Executive Room shows real data | Live API | Target | | 9.2 | Approval Center queries real records | Live API | Target | | 9.3 | Saudi Compliance runs real checks | Live checks | Target | | 9.4 | 1 surface used in real weekly review | Stakeholder confirmation | Target | | 9.5 | Board-ready export path works | PDF/JSON export | Target | ## Gate 10: Market Dominance | # | Item | Required Evidence | Status | |---|------|------------------|--------| | 10.1 | Product packaging defined (3 tiers) | `market-dominance-plan.md` | Done | | 10.2 | ROI narrative with quantified metrics | Documented | Done | | 10.3 | Competitive wedge documented | Documented | Done | | 10.4 | Capability moat map documented | Documented | Done | | 10.5 | Executive sales story (4 personas) | Documented | Done | | 10.6 | Reference architecture diagram | Documented | Done | --- ## Summary | Gate | Done | Target | Total | |------|------|--------|-------| | G1: Truth Lock | 3 | 0 | 3 | | G2: Document Consistency | 4 | 0 | 4 | | G3: Decision Plane | 2 | 2 | 4 | | G4: Execution Plane | 4 | 1 | 5 | | G5: Trust Fabric | 1 | 5 | 6 | | G6: Data & Connectors | 2 | 3 | 5 | | G7: Operating Plane | 0 | 6 | 6 | | G8: Saudi/GCC | 3 | 3 | 6 | | G9: Executive Surfaces | 0 | 5 | 5 | | G10: Market Dominance | 6 | 0 | 6 | | **TOTAL** | **25** | **25** | **50** | **Completion: 50%** — All documentation gates done. Runtime/integration gates remain.